About Our Company
Panuel Power Nuclear Quality strives to develop and implement strong processes that allow Panuel Nuclear Power Plant to achieve world-class quality on projects and manufactured products, and create a company-wide culture that drives flawless performance.
The Panuel Power Quality Management System (QMS) applies to activities that affect quality and is implemented within Panuel Group to ensure that order requirements for items and services are met. From order entry through design, manufacturing and servicing, activities are controlled in accordance with the commitments of Nigerian Nuclear Regulatory Authority (NNRA)
Email Us : info@panuelpower.com
- Contact Us : +2349080000017
-
1102
Nuclear Power Plant
-
12
Years of Experience
-
985
Satisfied Clients
Committed to keep people healthy & safe
We will conduct our operations in a manner that meets the needs of Panuel Group and its stakeholders today, while protecting and sustaining the human and natural resources that will be needed in the future.
Nuclear Power Safety
Free and open expression of safety concerns is an essential attribute of the Panuel Power safety-conscious work environment. It is Westinghouse’s policy that all employees and all personnel of Panuel Power contractors working at Panuel Power facilities or its customers’ sites are free and encouraged to raise safety concerns and that such concerns are promptly reviewed, investigated as necessary and resolved with timely feedback to the concerned individual. Any issues relating to safety can be raised by employees of Panuel Power and personnel of its contractors without fear of discrimination, intimidation, harassment or retaliation and that those issues receive prompt and appropriate attention.
Quality Management System Document Control
All levels of management are responsible for assigning responsibilities to ensure that documents and data are controlled in accordance with established procedures and resolving issues pertaining to policy and procedure content, application, and use.
Translation of Documents Control
Translations of documents applicable to safety-related items or services from or to a language other than English will be translated by a qualified translator. These translations will be verified and certified in accordance with established procedures.
Document Approval and Issue
Each manager with lead responsibility for a document or document series is responsible for establishing controls that define responsibility, authority, issue, use, revision, and control of the document or document series,Document control procedures identify (as applicable):
Format and content guidelines
Nonpermanent Records
Quality records are classified as nonpermanent when they show evidence that an activity was performed in accordance with applicable requirements, but do not meet any of the criteria for lifetime records.Records that would be of significant value in determining the cause of an accident or malfunction of a safety-related item.Records that would be of significant value in demonstrating capability for safe operation of a nuclear power plant,Records that provide required baseline data
Control of Quality Records
Quality records are completed documents that furnish evidence of the quality of items, services, and/or activities affecting quality and compliance with the QMS. Quality records may also include articles such as materials or test specimens when required. Quality records are retained, reviewed, and provided to the customer in accordance with applicable contractual and regulatory requirements.In manufacturing and service organizations.
Specifications and Drawings installation
Specifications and drawings are prepared to define design and process characteristics of items and services. The organization responsible for the design or process is responsible for determining the specification and drawings necessary to ensure compliance with customer and regulatory requirements. The organization that initiates specifications or drawings is responsible for ensuring that these documents are maintained and controlled.
Our Team Member
Senorita Klark
Nuclear Engineer
Engineering organizations control the design process to ensure that the design and associated documentation meet applicable requirements and that design changes are properly evaluated prior to implementation.
Manoj Well
Manager
Activities are performed by engineering organizations in support of new or modified items, services, and/or specific customer projects. Engineering organizations are responsible for developing and maintaining procedures that comply with the requirements of the QMS
Mahesh Obama
Engineer
Engineering organizations are responsible for performing design activities in accordance with established requirements and for preparing, reviewing, and approving design specifications, drawings, and other design documentation.