About Our Company

Panuel Power Nuclear Quality strives to develop and implement strong processes that allow Panuel Nuclear Power Plant to achieve world-class quality on projects and manufactured products, and create a company-wide culture that drives flawless performance.

The Panuel Power  Quality Management System (QMS) applies to activities that affect quality and is implemented within Panuel Group to ensure that order requirements for items and services are met. From order entry through design, manufacturing and servicing, activities are controlled in accordance with the commitments of Nigerian Nuclear Regulatory Authority (NNRA)

Email Us : info@panuelpower.com

  • Contact Us : +2349080000017
  • 1102

    Nuclear Power Plant

  • 12

    Years of Experience

  • 985

    Satisfied Clients

Nuclear Power Safety

Free and open expression of safety concerns is an essential attribute of the Panuel Power safety-conscious work environment. It is Westinghouse’s policy that all employees and all personnel of Panuel Power contractors working at Panuel Power facilities or its customers’ sites are free and encouraged to raise safety concerns and that such concerns are promptly reviewed, investigated as necessary and resolved with timely feedback to the concerned individual. Any issues relating to safety can be raised by employees of Panuel Power and personnel of its contractors without fear of discrimination, intimidation, harassment or retaliation and that those issues receive prompt and appropriate attention.

Quality Management System Document Control

  All levels of management are responsible for assigning responsibilities to ensure that documents and data are controlled in accordance with established procedures and resolving issues pertaining to policy and procedure content, application, and use.

Read More

Translation of Documents Control

Translations of documents applicable to safety-related items or services from or to a language other than English will be translated by a qualified translator. These translations will be verified and certified in accordance with established procedures.

Read More

Document Approval and Issue

Each manager with lead responsibility for a document or document series is responsible for establishing controls that define responsibility, authority, issue, use, revision, and control of the document or document series,Document control procedures identify (as applicable):

Format and content guidelines

Read More

Nonpermanent Records

Quality records are classified as nonpermanent when they show evidence that an activity was performed in accordance with applicable requirements, but do not meet any of the criteria for lifetime records.Records that would be of significant value in determining the cause of an accident or malfunction of a safety-related item.Records that would be of significant value in demonstrating capability for safe operation of a nuclear power plant,Records that provide required baseline data 

Read More

Control of Quality Records

Quality records are completed documents that furnish evidence of the quality of items, services, and/or activities affecting quality and compliance with the QMS. Quality records may also include articles such as materials or test specimens when required. Quality records are retained, reviewed, and provided to the customer in accordance with applicable contractual and regulatory requirements.In manufacturing and service organizations.

Read More

Specifications and Drawings installation

Specifications and drawings are prepared to define design and process characteristics of items and services. The organization responsible for the design or process is responsible for determining the specification and drawings necessary to ensure compliance with customer and regulatory requirements. The organization that initiates specifications or drawings is responsible for ensuring that these documents are maintained and controlled.

Read More

Our Team Member

Senorita Klark

Nuclear Engineer

  Engineering organizations control the design process to ensure that the design and associated documentation meet applicable requirements and that design changes are properly evaluated prior to implementation.

  •  
  •  
  •  

Manoj Well

Manager

Activities are performed by engineering organizations in support of new or modified items, services, and/or specific customer projects. Engineering organizations are responsible for developing and maintaining procedures that comply with the requirements of the QMS

  •  
  •  
  •  

Mahesh Obama

Engineer 

Engineering organizations are responsible for performing design activities in accordance with established requirements and for preparing, reviewing, and approving design specifications, drawings, and other design documentation.